Drywall Supply, in Loveland, delivering 4x12 sheetrock up to the gate. The road on up to the house was snow packed, so my neighbor Andrew lent me a hand and we hauled all this on up to the house with his 4wd pickup and trailer. |
Robbie, w/ All Star Gas in Loveland, setting the 500gal propane tank. |
Built my own pre-hung door units using 4-panel knotty pine door slabs, and for the frames, used #3 pine 1x4's. |
|
With all the snow on the ground, I hired a couple of the stucco guys to help hang drywall. Time to install interior doors. Going with a sheetrock-wrapped door frame. |
Working on the stucco after FOUR snow storms. |
Dave (left) Doug (right) A couple of cools guys running the show down at Drywall Supply in Loveland. |
|
The front porch ready for decking and metal corrugated roofing. |
Stucco was finished the last week of January. (behind the house, in the centre of this photo, you can see the 85ft tower ready for the wind turbine.) |
I can screw up things real good! Ha! Here I am screwing down 1000+ sqft of underlayment before tile. |
|
FEB 11th - Craig, Nate, Kraig, and myself start the solar & wind power install. This array will hold 9ea KYOCERA 175watt panels attached to a WATTSUN single-axis tracker. |
Wiring the solar array. |
My folks came out to visit for a week the last part of Feb, so I put my Dad to work helping wire the wind turbine. (to see a good photo of the WHISPER 100 turbine atop the tower, go to the "UPDATES" page.) |
|
The turbine tower 30ftt above 50ft tall pine trees. |
Wind turbine controller (left) and the solar array charge controller/inverter (right) feeding the battery bank. |
24volt battery bank (each battery - 6v/419Ahr) When the batteries reach a certain voltage, they produce hydrogen gas which is HIGHLY explosive! A vent fan install at the top of the battery bank room comes on to exhaust the gas outside. |
|
Wiring the AC panel. |
Textured every inch of the house by hand using a skip-trowel method. (i'll NEVER do that again!) |
Was going to paint with a roller and brush, bought a sprayer and will never use a roller again! |
|
Installing the front porch decking while Mahi takes a break. |
Making a mess with the tile saw. |
Uncle Steve helping out with most of the tile detail. |
|
Built my own Knotty Alder cabinets. |
Cabinets are installed, time now for LOTS of grout! Here I'm grouting the woodburning stove area. (note: Life is too short for grouting!!) |
I maybe off-grid... but still connected to the world via satellite w/ Direct TV (left) & WildBlue internet (right). |
|
Guest bath |
Staining interior doors. |
Installing Formica counter tops. |
|
Grouting the kitchen backsplash. Cut 12 x 12 slate tiles into 6 x 6's and tossed in a few deco tiles. |
Todd w/ Elite Flooring carpeting the bedrooms. Used a P.E.T. type carpet. (CLICK this photo and goto a website with more info on P.E.T. carpet.) |
A shot of Long's Peak from the road! |